Common problem
How to install buoy level gauge
時(shí)間:2020-09-25瀏覽量:1062

一、浮標(biāo)液位計(jì)安裝調(diào)試

1、 Installation and commissioning of buoy level gauge

1、按照兩個(gè)導(dǎo)向滑輪的間距,在容器上方開(kāi)三個(gè)孔,分別焊接導(dǎo)向螺栓管和滑輪導(dǎo)管;在容器外側(cè)焊接標(biāo)尺支架,高度以保持兩個(gè)導(dǎo)向滑輪水平為準(zhǔn)

1. According to the distance between the two guide pulleys, three holes are drilled on the top of the container to weld the guide bolt tube and pulley guide tube respectively; the scale bracket is welded on the outside of the container, and the height shall be based on the level of the two guide pulleys

2、浮標(biāo)液位計(jì)的調(diào)零

2. Zero adjustment of float level gauge

在浮標(biāo)液位計(jì)安裝時(shí),罐內(nèi)應(yīng)還未有被測(cè)介質(zhì),浮標(biāo)在罐內(nèi)的底部時(shí),重錘指針部分的紅色尖頭指示應(yīng)指在標(biāo)尺測(cè)量范圍的頂部“零”值上,否則要調(diào)整鋼絲長(zhǎng)度。

When the buoy level gauge is installed, there is no medium to be measured in the tank. When the buoy is at the bottom of the tank, the red pointed indication of the pointer part of the heavy hammer should be on the top "zero" value of the scale measurement range, otherwise, the length of the steel wire should be adjusted.

3、浮標(biāo)液位計(jì)量程調(diào)整

3. Range adjustment of buoy level gauge

浮標(biāo)液位計(jì)在調(diào)好零位的基礎(chǔ)上,再把浮標(biāo)拉到容器的頂部或最大測(cè)量點(diǎn)上,重錘指針部分的紅色尖頭應(yīng)指在標(biāo)尺的底部位置上,即落在標(biāo)尺最大量程點(diǎn)上。

On the basis of adjusting the zero position of the float level gauge, pull the buoy to the top of the container or the maximum measuring point. The red tip of the pointer part of the heavy hammer should point to the bottom position of the scale, that is, on the maximum measuring point of the scale.

二、浮標(biāo)液位計(jì)安裝使用和注意事項(xiàng)

2、 Installation, use and precautions of buoy level gauge

1、導(dǎo)向鋼絲下支承焊接安裝:

1. Welding and installation of lower support of guide wire:

在容器底部按照液位計(jì)浮子運(yùn)動(dòng)方向要求確定位置,焊接或鉚接好固定導(dǎo)向鋼絲下支承。如設(shè)備不具備焊接條件,可采用重錨固定方式固定導(dǎo)向鋼絲下支承。如容器內(nèi)液面波動(dòng)不大,可不安裝導(dǎo)向鋼絲。

Determine the position at the bottom of the container according to the requirements of the float movement direction of the liquid level gauge, and weld or rivet the lower support of the fixed guide wire. If the equipment does not have welding conditions, heavy anchor can be used to fix the lower support of guide wire. If the liquid level in the container fluctuates little, the guide wire can not be installed.

2、導(dǎo)向鋼絲的安裝:

2. Installation of guide wire:

(1)用力使鋼絲拉直,并固定在下支承上,注意不要使鋼絲有彎曲或打結(jié)現(xiàn)象,以免影響浮子上下移動(dòng)。

(1) Force the steel wire to straighten and fix it on the lower support. Pay attention not to make the steel wire bend or knot, so as to prevent the float from moving up and down.

(2)導(dǎo)向鋼絲通過(guò)浮子的導(dǎo)向環(huán),后穿入吊勾螺釘,把鋼絲的終端固定并用導(dǎo)線夾頭夾緊,并旋緊吊勾螺母,使其處于緊張狀況,再將上螺母拼緊,以防松動(dòng),然后蓋好封蓋。

(2) The guide steel wire passes through the guide ring of the float and then goes through the hook screw. The end of the steel wire is fixed and clamped with the wire clamp. The hook nut is tightened to make it in tension. Then, the upper nut is tightened to prevent loosening, and then the cover is covered.

(3)兩根導(dǎo)向鋼絲要垂直地面,而且相互平行,保證兩者之間距離與浮子的導(dǎo)向環(huán)的中心距一致

(3) The two guide wires should be vertical to the ground and parallel to each other to ensure that the distance between them is consistent with the center distance of the float guide ring

4、 標(biāo)尺安裝:

4. Scale installation:

標(biāo)尺的長(zhǎng)度是按用戶在訂貨時(shí)所提供的測(cè)量范圍而確定的,在安裝時(shí)要求:

The length of the scale is determined according to the measurement range provided by the user when ordering. During installation, the following requirements are required:

(1)標(biāo)尺的連結(jié)部分應(yīng)做到平直、光滑、不應(yīng)有凹凸現(xiàn)象,以免影響重錘指針的正常運(yùn)行,或引起測(cè)量的誤差。

(1) The connecting part of the scale shall be straight, smooth and free of concave convex phenomenon, so as to avoid affecting the normal operation of the heavy hammer pointer or causing measurement error.

(2)標(biāo)尺應(yīng)與貯罐內(nèi)液面相垂直,不應(yīng)有傾斜現(xiàn)象, 標(biāo)尺安裝的垂直度不能大于5°,以免造成重錘指針卡死,使測(cè)量失敗。

(2) The ruler should be perpendicular to the liquid surface in the tank without inclination. The verticality of the scale installation should not be greater than 5 ° to avoid jamming of the heavy hammer pointer and failure of measurement.

(3)在焊接標(biāo)尺腳架時(shí),應(yīng)盡量做到安裝表面在同一平面上,安裝孔在同上直線上,即做到確保標(biāo)尺的刻度面及重錘指針兩側(cè)導(dǎo)向均要平直稱為直線,使重錘指針在標(biāo)尺槽中靈活升降。

(3) When welding the scale bracket, the installation surface should be on the same plane as far as possible, and the installation hole should be on the same straight line, that is to ensure that the scale surface of the scale and the guide of both sides of the heavy hammer pointer should be straight, which is called a straight line, so that the heavy hammer pointer can rise and fall flexibly in the scale groove.

5、 浮標(biāo)連接鋼絲及重錘指針的安裝:

5. Installation of buoy connecting steel wire and heavy hammer pointer:

浮標(biāo)與連接鋼絲的一端用導(dǎo)線夾頭夾緊固定,然后將連接鋼絲的另一端裝進(jìn)事先安裝好的兩個(gè)導(dǎo)向滑輪盒內(nèi),并和重錘指針相連接,用導(dǎo)線夾頭夾緊固定,最后調(diào)整各導(dǎo)向滑輪支架,使連接鋼絲與水平垂直,使浮標(biāo)在導(dǎo)向鋼絲上活動(dòng)靈活,有輕滑感、無(wú)卡死、扭曲、打結(jié)、打卷或損傷等現(xiàn)象。

The buoy is clamped and clamped with one end of the connecting steel wire, and then the other end of the connecting steel wire is installed in the two guide pulley boxes which are installed in advance, and is connected with the heavy hammer pointer, clamped and fixed with the wire clamping chuck. Finally, the guide pulley support is adjusted, so that the connecting steel wire is vertical to the horizontal, so that the buoy moves flexibly on the guide wire, and has a light sliding feeling, no stuck and twisted. Knotting, rolling or damage.